8.3 MAINTENANCE SCHEDULE

The services schedules in the table are described in the single operation diagrams.

Before each
start-up
Check oil and engines water levels
Check generators oil level
Before navigation Check oil level and pressure in the steering system
Every 10
hours service
Check oil levels of all electro-hydraulic systems
Every 24 hours Check the condition of the stuffing box cases


CAUTION

After approximately 10 hours of navigation, tighten all hoses clamps, this operation has already been done at pre-start, but has to be repeated because of settlings and expansions.