The services schedules in the table are described in the single operation diagrams.
| Before each start-up |
Check oil and engines water levels Check generators oil level |
| Before navigation | Check oil level and pressure in the steering system |
| Every 10 hours service |
Check oil levels of all electro-hydraulic systems |
| Every 24 hours | Check the condition of the stuffing box cases |
After approximately 10 hours of navigation, tighten all hoses clamps, this operation has already been done at pre-start, but has to be repeated because of settlings and expansions.